Both types carry load, but they differ a lot in how the work is done on site, how long it takes and the hidden costs. This article sums it up in one table.

By the KEMREX engineering team · · Updated 10 Nov 2026 · 3 min read

KEMREX helical steel piles laid out beside a pit with an existing concrete pile
A real site: galvanized helical steel piles next to an existing concrete pile in the pit.
Short answerHelical steel piles are installed by screwing them into the ground, and the structure can go up right after installation, with less vibration and excavation. Concrete piles must be driven, or bored and filled with concrete, with more steps and more cost items. Home extensions, tight spaces and sites next to existing buildings often gain clear benefits from helical steel piles, but the real choice should depend on the load, the soil test results and the site.
Key points
  • Helical steel piles are screwed into the ground, so the structure can go up right away. There is no waiting for concrete.
  • They reduce vibration and excavation, which suits sites next to neighboring houses or tight spaces.
  • The main cost items for KEMREX are only the piles and transport. Concrete work adds formwork, labor and machinery.
  • Which type fits depends on the load, the soil test results and the site. Let an engineer do the design.

Compared in one table

PointKEMREX helical steel pilesConcrete piles
How they go inScrewed into the ground by hydraulic driveDriven into the ground, or bored and filled with concrete in the hole
Building on topRight after installationMust wait for the concrete to set, step by step
VibrationReduced vibration, no impact on existing structures or neighboring housesDriving causes vibration in the surrounding area
Soil and wasteLess excavation and less construction wasteExcavated soil, concrete debris and formwork
Tight spacesCan get in (Hand Drive uses 2–3 people, KMO needs a safety zone of 2 m or more)Depends on the size of the pile driver or boring rig
RemovalCan be removed and reusedHard to remove

Cost: look at every item

When comparing prices, many people only compare the price per pile. The real cost includes everything needed until the foundation is ready to carry the structure.

KEMREX helical steel pilesConcrete piles
KEMREX pilesConcrete piles
TransportTransport
—Steel cutter
—Concrete mixer
—Formwork
—Labor

The actual price depends on the Series, the length and the site conditions. The fairest way to compare is to get quotes for both types based on the same drawings and the same site.

Time on site

KEMREX helical steel piles take about 15–20 min per pile with machine methods (Machine Drive, MDT, KMO) and about 30–45 min per pile with Hand Drive. Actual time depends on the area, site conditions and pile length. Once installation is done, the structure can go up straight away, which helps you finish the job sooner.

KEMREX Machine Drive vehicle installing helical steel piles on site
Machine Drive: a small, high-torque installation vehicle, about 15–20 min per pile.

Environmental impact

KEMREX data states the following results from using 100 KEMREX piles:

  • 5 tons less CO₂ emitted
  • 80% less construction waste
  • 5,000 liters less water used
  • 50% less energy

In addition, the KEMREX W114x21000 has a product carbon footprint certification (TGO) of 713 kgCO₂e per pile.

Which one should you choose?

  • Next to an existing or neighboring house: helical steel piles reduce vibration and do not affect the existing structure.
  • Tight or hard-to-reach sites: helical steel piles have installation methods that use people or small vehicles.
  • Jobs that need to finish fast: the structure can go up right after installation.
  • Projects that are already designed: to change the pile type, an engineer must recalculate and redesign based on the soil test results.

Want to compare prices for your design?Send us your drawings or site photos. The KEMREX engineering team will assess them and send you a quote.

Chat on LINE @KEMREX

Frequently asked questions

Are helical steel piles more expensive than concrete piles?

The price per pile depends on the Series, the length and the site conditions. Looking at total cost, the main items for KEMREX helical steel piles are only the piles and transport, while concrete pile work adds formwork, labor, a concrete mixer and a steel cutter. Ask for quotes based on the same drawings to compare.

Can helical steel piles be used for large buildings or factories?

Yes. Series D and W (including the DW sub-model) carry 15–100 tons, are 6–34 m long and reach the hard soil stratum. They are used for buildings, factories and power plants.

Can I switch from the concrete piles in my existing design to helical steel piles?

An engineer needs to recalculate and redesign based on the soil test results and the structural load. The KEMREX team provides soil testing, design calculations and installation in one place.