INSTALLATION
FAST
KEMREX
week 1
Survey / plan
Install KEMREX foundations
CONCRETE
week 1
Survey / plan
Digging soil / throwing soil away
Duration 1 Piece 30 minutes
week 2
Piling work
week 3
Cut pile head
Concrete reinforcement work pouring concrete
Removing concrete / curing concrete
Products Environmentally Friendly
KEMREX
The use of steel needles in the construction of the foundations outside will be convenient, fast and accessible to all areas with various installations. Also helps reduce noise in the work Does not damage the surrounding area with the innovation of steel needles
OUR equipment
The use of equipment in the installation of the foundation, in addition to taking into account the standard equipment Must also consider safety and comfort of customers as important in each area Because service is important
COMBINED EXPERIENCE
Machine Drive
kemrex
Can be used with all steel needles Use the computer system to calculate the piling. Suitable for jobs that are large and accessible.
Anchor 1
kemrex
Hand Drive
Able to access all areas of the site, suitable for steel needles, size N and FS, used as a lock, can be used to set the needle and measure the eye level
kemrex
Hand Drill
For the work area, there is no electricity, suitable for steel needles, size N,F/FF, FS. In some models