INSTALLATION

FAST

 KEMREX

 week 1

Survey / plan

Install KEMREX foundations

CONCRETE

 week 1

Survey / plan

Digging soil / throwing soil away

Duration 1 Piece 30 minutes

 week 2

Piling work

 week 3

Cut pile head

Concrete reinforcement work pouring concrete

Removing concrete / curing concrete

KEMREX VS CONCRETE

Products Environmentally Friendly

KEMREX

The use of steel needles in the construction of the foundations outside will be convenient, fast and accessible to all areas with various installations. Also helps reduce noise in the work Does not damage the surrounding area with the innovation of steel needles

OUR equipment

The use of equipment in the installation of the foundation, in addition to taking into account the standard equipment Must also consider safety and comfort of customers as important in each area Because service is important

COMBINED EXPERIENCE

KEMREX Machine Drive
5-60min

Machine Drive

kemrex

Can be used with all steel needles Use the computer system to calculate the piling. Suitable for jobs that are large and accessible.

Installation Procedure

first

Installation Procedure

second

Installation Procedure

third

Anchor 1
KEMREX Hand Drive

kemrex

Hand Drive

30-60min

Able to access all areas of the site, suitable for steel needles, size N and FS, used as a lock, can be used to set the needle and measure the eye level

Installation Procedure

first

Installation Procedure

second

Installation Procedure

third

KEMREX Hand Drill

kemrex

45-60min

Hand Drill

For the work area, there is no electricity, suitable for steel needles, size N,F/FF, FS. In some models

Installation Procedure

first

Installation Procedure

second

Installation Procedure

third