GET IN TOUCH:

Tel : 02-026-3140 ต่อ 0

Address : KEMREX Company Limited

SUTEE Group Bldg, 3rd, and 4th FL

27/5 Village No. 7 Kingkaew - Thepharak Road, 

Bang Phli Yai, Bang Phi, Samut Prakan, 10540

© 2023 by L&T architects. Proudly created with Wix.com

CONTACT US:

OUR equipment

The use of equipment in the installation of the foundation, in addition to taking into account the standard equipment Must also consider safety and comfort of customers as important in each area Because service is important

COMBINED EXPERIENCE

Machine Drive

Can be used with all steel needles Use the computer system to calculate the piling. Suitable for jobs that are large and accessible.

Installation Procedure

first

Installation Procedure

second

Installation Procedure

third

 

Hand Drive

Able to access all areas of the site, suitable for steel needles, size N and FS, used as a lock, can be used to set the needle and measure the eye level

Installation Procedure

first

Installation Procedure

second

Installation Procedure

third

Hand Drill

For the work area, there is no electricity, suitable for steel needles, size N,F/FF, FS. In some models

Installation Procedure

first

Installation Procedure

second

Installation Procedure

third