KEMREX innoVISION Foundation ภาษาไทย +66 2 026 3140 Free consultation
Basics

What Are Helical Steel Piles, How Do They Work and How Much Can They Carry?

How screw pile foundations work, how they are installed, how long they last and where they fit best, explained by the KEMREX engineering team.

By the KEMREX engineering team · · Updated 11 Nov 2026 · 3 min read

A galvanized KEMREX helical steel pile being screwed into a lawn
Helical steel piles are screwed in by hydraulic drive instead of being driven, or bored and filled with concrete.
Short answerA helical steel pile (screw pile) is a steel pipe pile with helix plates around it. It is installed by screwing it into the ground with hydraulic drive, instead of driving it, or boring and filling with concrete. The helix plates transfer the load into the soil, so the structure can go up right after installation. KEMREX helical steel piles come in 5 Series, with load capacities from 300 kg to 100 tons.
Key points
  • A helical steel pile is a steel pipe with helix plates. It is screwed into the ground, with no driving and no concrete.
  • The helix plates transfer the load into the soil, so the structure can go up right after installation.
  • KEMREX offers 5 Series with load capacities from 300 kg to 100 tons and lengths of 1–34 m.
  • The steel is hot-dip galvanized (HDG) at 100 microns and has passed more than 2,000 hours of salt spray testing.

How helical steel piles work

A helical steel pile does the same job as any pile: it carries the load of the structure and transfers it down to soil that is strong enough. The difference is how it goes into the ground and what it is made of.

  • Steel pipe (the shaft): hot-dip galvanized steel, with diameters from 68 mm up to 355 mm depending on the Series.
  • Helix plates: as the pile turns, the helix plates pull it into the ground like a screw, and add bearing area once the pile reaches its design depth.
  • Pile head: each Series has its own pile head, such as a flange plate (Plate) or a Dowel, so it can connect right away to concrete beams, steel beams, concrete footings, timber posts, steel columns or J-Bolts.
Rendering of a helical steel pile with helix plates embedded in soil
Rendering: the helix plates around the shaft anchor the pile and transfer the load into the soil.

How they are installed and how long it takes

Before installation, the KEMREX team tests the soil on site with the Kunzelstab Penetration Test to calculate load capacity and design the pile length. The piles are then screwed into the ground with equipment that suits the site. Our engineering team controls all of the work.

MethodBest forApprox. time
Hand DriveHydraulic tools operated by 2–3 people. Good for tight spaces.30–45 min/pile
Machine DriveSmall installation vehicle with higher torque. Needs a safety zone of 4 m or more.15–20 min/pile
MDTInstallation rig on a crawler. Works on rough ground or soft soil.15–20 min/pile
KMOSmall installation vehicle similar to an ATV. Gets into tight spaces (safety zone of 2 m or more).15–20 min/pile

Actual time depends on the area, site conditions and pile length. There is no concrete to pour or cure, so the structure can go up right after installation.

How much load they can carry

KEMREX helical steel piles come in 5 Series, covering everything from small home extensions to industrial structures.

SeriesLoad capacityLengthDiameter
N300 – 6,000 kg1 – 3 m68 – 76 mm
F1,500 – 18,000 kg1.2 – 3 m68 – 76 mm
FS1,600 – 30,000 kg1.2 – 6 m68 – 355 mm
D15 – 100 tons6 – 34 m76 – 220 mm
W (incl. DW)15 – 100 tons6 – 34 m76 – 220 mm

The actual capacity of each pile depends on the soil test results and the engineer's design. Every Series has passed static load testing (Static Load Test) to ASTM D-1143. Read how to pick each Series in Choosing the right Series.

How long they last

  • 100-micron HDG coating: hot-dip galvanized (HDG) steel.
  • Salt Spray Test over 2,000 hours: to ASTM B117, with no more than 5% red rust at 1,032 and 2,016 hours.
  • Standards and certifications: TIS 3357-2565, ISO 9001:2015 (since 2018), ISO 14001, and a design patent from the Department of Intellectual Property.
  • Product liability insurance: Product Liability Insurance with coverage of 300 million baht, together with Allianz Ayudhya.

Where they fit best

Helical steel piles install fast, reduce vibration and get into tight spaces, so they suit both homes and industry.

  • Homes: balcony extensions, carports, roof structures, prefabricated (knock-down) houses.
  • Industry: factories, power plants, machine foundations, Pipe Supports, signs and light poles.
  • Solar energy: solar farms and solar carports.
  • Temporary work: the piles can be removed and reused.

Want to know if helical steel piles suit your project?Send us your drawings or site photos. The KEMREX engineering team will assess them for free.

Chat on LINE @KEMREX

Frequently asked questions

Do helical steel piles rust?

KEMREX helical steel piles are hot-dip galvanized (HDG) at 100 microns and have passed more than 2,000 hours of neutral salt spray testing (ASTM B117), with no more than 5% red rust at 1,032 and 2,016 hours.

How long does it take to install a helical steel pile?

It depends on the installation method. Hand Drive takes about 30–45 min per pile. Machine methods (Machine Drive, MDT, KMO) take about 15–20 min per pile. Actual time depends on the area, site conditions and pile length.

Do I need a soil test before installation?

Yes, you should have one. KEMREX tests the soil on site with the Kunzelstab Penetration Test before installation, to calculate load capacity and design the foundation to sound engineering practice.

Can helical steel piles be removed and reused?

Yes. Helical steel piles can be removed and reused, which suits temporary structures or work that may move in the future.

KEMREX engineering teamKEMREX Company Limited, manufacturer and installer of helical steel pile foundations. Free consultation on LINE @KEMREX or call +66 2 026 3140.