top of page

PRODUCT & SERVICE

KEMREX Products & Services

Complete technical data for all models, specification tables, comparisons with concrete pillars, and service procedures from survey to delivery.

Steel piles

**Note: Load-bearing, pulling, and pushing forces may vary depending on soil conditions and actual site characteristics. These must be assessed and confirmed by an engineer before use.**

ENGINEERING ADVANTAGE

HOT DIP GALVANIZED
Rust resistant for 100+ years.

High-temperature 450°C zinc coating technology creates an 80-120 micron thick rust-protective layer, resistant to all environments — saltwater, acids, alkalis, moist soil — without maintenance.

COMPARISON

KEMREX Steel piles VS. Concrete piles

Duration/Start

Price comparison

Sound & Vibration

On-site impact.

Workspace

Continuing with the structure.

KEMREX

30 minutes. Save time.

Reduce unnecessary expenses.

Silent and vibration-free.

The work site is clean and dust-free.

Can access all narrow spaces.

Works with all structures.

(Cement / Steel / Wood)

Concrete pillars

1-2 days

Hidden costs: demolition/filling/excavation.

Loud, high-pitched sound

Soil/cement contamination can affect the structure.

A setback distance is required.

Allow to cure for 7-8 days.

KEMREX product range

01

See more

FOUNDATION SYSTEM

Steel pile foundation systems for all types of construction projects, adjustable in size.

KEM Dec2.png

02

See more

TREE SUPPORT

Complete your garden perfectly with Flextree tree supports – steel stakes to prevent trees from falling.

KEM Dec2.png

03

EZ MOUNTING

See more

SOLAR MOUNTING

Mounting brackets for ground-mount and rooftop solar panels.

KEM Dec2.png

04

BLU HOUSE

See more

-

-

SERVICE PROCESS

Service procedures

01

Conduct a site survey.

Our team of engineers will conduct on-site soil inspections and measure the area free of charge.

02

Design & Quotation

Calculate the load using a computer. Send a quotation including installation.

03

Production & Preparation

We manufacture poles to specifications, use hot-dip galvanizing, and deliver them to the site.

04

On-site installation

Installation takes 30 minutes per tree using specialized machinery.

05

Delivery & Warranty

Test load, submit documents.

Installation work is guaranteed.

QUALITY & STANDARDS

Quality standards and certifications.

KEMREX manufactures and installs piles under standards certified by both domestic and international agencies, ensuring that every pile is strong, safe, and durable.

01.png
02.png
03.png
04.png
05.png
06.png
08.png
14.png
09.png
10.png
11.png
12.png
13.png

Start your project today.

Consult with the KEMREX engineering team for free, with no obligation, and receive a site assessment.

LOGO 2.png

A leading provider of steel screw piles for all types of foundation work.

Quick installation, no vibration, guaranteed to meet international standards.

KEMREX Company Limited

SUTEE Group Bldg, 3rd, and 4th FL

27/5 Village No. 7 Kingkaew - Thepharak Road, 

Bang Phli Yai, Bang Phi, Samut Prakan, 10540, Thailand

Contact us

© 2026 KEMREX innoVISION Foundation All rights reserved.

bottom of page