Hand Drive
30–45 min per pileHydraulic tool operated by 2–3 people. Works well in tight spaces.
Piles are screwed into the ground with no digging and no waiting for concrete to cure, so the structure can go up right away.
Timing depends on the area, site conditions, and pile length.
An on-site Kunzelstab Penetration Test finds the actual bearing capacity of the soil layers.
Our engineers select the pile series, number, and length to sound engineering principles.
We match the equipment to the site, then install and level each pile to millimeter accuracy.
Engineers supervise the work. The structure can go up right away.

Hydraulic tool operated by 2–3 people. Works well in tight spaces.

Small installation rig with more torque than Hand Drive. Works with every pile series.

Crawler-mounted installation rig. Works on rough ground and soft soil.

Small, high-torque rig similar to an ATV. Fits into tight spaces.
From helix plates turning into the soil to large installation rigs. The helix plates around the pile shaft increase its load capacity.
Send us drawings or site photos, or just tell us what you are building. Our engineering team will help you choose a series and assess your site. Monday to Saturday, 08:00–17:00.