KEMREX innoVISION Foundation TH
Call us

Foundation for Every Future

The first helical steel piles (screw piles) in Thailand certified to TIS 3357-2565 and tested to ASTM standards. Designed and supervised by engineers, from home extensions to power plants.

Installed to date, over

More than 3,000,000 piles installed to date

Beyond the limits of conventional foundations

Labor, time, cost and damage to neighboring property: helical steel piles that KEMREX manufactures and installs itself get past all of them.

  • For projects of every size

    300 kg – 100 tonsper pile

    From decks, fences and solar farms to buildings, factories and power plants

  • Fast installation

    15–45 min per pile. A knockdown system takes just 1 day, and you can build on the piles right away with no wait for concrete to cure.

  • No vibration

    No impact on existing structures or neighboring houses. Can be installed right next to walls. No noise, no dust, and a clean site because there is no excavation.

  • Strong and durable

    Hot-dip galvanized (HDG) steel, 100 microns. Passed salt spray testing of more than 2,000 hours.

  • Fits tight spaces

    Equipment in several sizes, from a 2–3 person hand crew to crawler rigs. Less demolition of existing floors. Suitable for all soil conditions.

  • Removable and reusable

    Piles can be removed and reused. Less excavation and less construction waste.

Cut the hidden costs of concrete piles

Concrete piles need equipment, formwork and on-site labor. With KEMREX you pay only for the piles and transport, with installation by our engineering team.

2cost items
  • 1KEMREX piles
  • 2Transport
  • 3Steel cutting machine
  • 4Concrete mixer
  • 5Formwork
  • 6On-site labor

5 Series, lengths from 1 m to 34 m

The bar on the right of each card shows that Series' length range against a depth of 0–34 meters

Each Series is shown with a sample model · Our engineers choose the actual model after assessing the site

Not sure which Series your project needs?

Pick a project type below, then set the approximate load per pile. The tool suggests a Series and installation method, and you can send the details to our engineering team right away.

From family homes to 5-story buildings

Real KEMREX projects for more than 200 corporate clients across Thailand

295piles
Infrastructure, Chiang Mai

Foundation for the 3rd Phra Mahathat Chedi, Doi Inthanon

Series D100: 179 piles · D30: 116 piles

100tons per pile
Infrastructure, Bangkok

Skywalk, King Chulalongkorn Memorial Hospital

Series D220: 33 piles

88piles
Infrastructure, Bangkok

Walkway link to an MRT station

Series W114: 88 piles

80piles
Heritage building, Royal Irrigation Department, Samsen

Rails to relocate Tuek Khaek, over 122 years old

Series W140: 80 piles

You've reached the bearing layer

Talk to an engineer for free before you start your foundation

Send us drawings or site photos, or just tell us what you are building. Our engineering team will help you choose a series and assess your site. Monday to Saturday, 08:00–17:00.

Call for advice+66 2 026 3140 ext. 0

Menu

View this page on the full website